Craiova Centru
Project brief: Craiova Centru 110kV substation is a very important connection point located in the hearth of Craiova city. ...more
Petromidia
Project brief: The end customer of the project was ROMPETROL oil company, more exactly Petromidia refinery located in Navodari, close to Black Sea. ...more
Project brief: Craiova Centru 110kV substation is a very important connection point located in the hearth of Craiova city. The scope of the project is complete modernization of the substation. As primary equipment there will be used GIS from SIEMENS and for secondary part relays from SIPROTEC family. SPECTRUM POWER was involved in the project as a subcontractor of SIEMENS Romania.
- 2 protection cubicles for 110kV cable lines equipped with 7SD52 line differential protection and 7SA63 back-up protection and control;
- 2 protection cubicles for 110/20kV power transformers equipped with 7UT63 differential protection and 7SJ63 back-up protection;
- 1 control cubicle for 110kV coupler equipped with 6MD63 control terminal;
- 1 automation cubicle for SCADA system equipped with two AK1703 redundant units;
- cubicle design;